Evaluate the slab
The project starts with an in-person look at the concrete, the space, and the finish you want.

Know the system
Straightforward guidance for property owners and installers before the project, pour, or training day.
Installation sequence
A simplified view of the Resin Geekz process. Final steps and timing depend on the evaluated project.
The project starts with an in-person look at the concrete, the space, and the finish you want.
The concrete is mechanically ground and necessary repairs are addressed before the coating system begins.
Base coat, decorative layer, and the appropriate finish are installed as a connected system.
The surface is completed with its protective coat and you receive guidance for cure time and return to use.
Before installation
This checklist summarizes the existing Resin Geekz preparation guidance. Confirm the exact requirements for your scheduled project.
Frequently asked
Timing, preparation, products, metallic finishes, and training.
On qualifying projects, Resin Geekz completes preparation, repairs, base coat, full-flake broadcast, scrape, and protective topcoat in one managed installation day. Slab condition, size, moisture, and site conditions determine the final schedule.
Allow about 24 hours before light foot traffic and 48–72 hours before parking a vehicle. Resin Geekz will confirm the timing for your system and site conditions.
Yes. Resin Geekz mechanically grinds the concrete and addresses necessary repairs before installing the coating system.
No. Each metallic floor is worked by hand, so movement and visual depth vary from one installation to the next.
Contact Resin Geekz by text or phone for current pricing, availability, and shipping terms. Online checkout is not currently available.
Training takes place on a Resin Geekz installation or qualifying trainee project, depending on project fit and scheduling. Sessions focus on practical technique, workflow, and finish consistency.